Free quote

Tell us about your project.

Tell us about your building and the work you need. We’ll get back to you to set up a site visit. Prefer to talk? Call 604-861-6644.

Text us

By sending a request, you confirm you have read the privacy policy.

Line painting

Line painting in Vancouver and the Fraser Valley.

Faded stall lines? Worn forklift lanes? Crosswalk hard to see?

We repaint lines on parking lots, warehouse floors, pools and crosswalks. We can work overnight or on weekends around your traffic.

We paint lines across the Lower Mainland.

Request a quote →

Some people call it line striping or restriping. Either way, the goal is clear, straight markings that show drivers and staff where to go.

Line painting we do

  • Parking lot lines

    Stall lines, numbers, fire lanes, curbs and NO PARKING stencils on outdoor lots.

    Parking lot line painting

  • Warehouse safety lines

    Forklift lanes, walkways, crosswalks and hatched zones on warehouse and plant floors.

    Warehouse safety lines

  • Pool lane lines

    Lane lines, wall targets and depth markings in public pools.

    Pool coatings

  • Stair edge striping

    Steps blending together? We paint a bright yellow stripe along the front edge of each step so people can see where it ends, indoors and out.

    We striped a set of school steps in Surrey.

    Safety yellow

  • Crosswalks

    Street and site crosswalks, from plain white bars to a full rainbow crosswalk.

  • Sports courts and playgrounds

    Can't tell if the ball landed in or out? We repaint faded boundaries and game lines on outdoor courts and refresh worn playground markings.

  • Parkade lines and stall numbers

    Stall lines, numbers and no-parking hatching repainted in underground and above-ground parkades.

    Parkade painting

Parking and safety lines can be repainted regularly as part of a maintenance contract. Maintenance contracts →

Who we do this for

Property managers, strata councils, warehouse operations managers and the people who run recreation centres.

Our line painting

Before: plain white crosswalk ahead of its rainbow repaint
Rainbow crosswalk, after: A plain white crosswalk repainted as a rainbow crosswalk
Rainbow crosswalk. A plain white crosswalk repainted as a rainbow crosswalk.
Yellow stair nosings painted on outdoor school steps, Surrey BC
Outdoor concrete steps with bright yellow nosings and a steel handrail
Outdoor public pool lines painted
Outdoor public pool lines painted
Outdoor public pool lines painted
Outdoor public pool lines painted
Indoor pool lane lines painted, New Westminster BC
Parkade stall numbers painted on a block wall, North Vancouver BC
Indoor pool safety markings painted, New Westminster BC
Freshly painted white crosswalk on paving stones beside yellow bollards
Yellow bar and white stencilled pedestrian wording painted across a paved lane

Line painting project

How a line painting job runs

  1. Site visit

    We walk the area with you and note every line, stencil and zone you need.

  2. Surface prep

    Dirt and debris are cleared so the paint grips the surface.

  3. Layout

    Lines, stencils and zones are measured and marked out before any paint goes down.

  4. Painting

    We work in sections so traffic can keep moving around us.

See the full process, step by step

For facility and property managers planning line work, here is every step we follow, from the first walk to reopening.

  1. 1. Site tour

    We walk the area with you and note every line, stencil and zone you need, along with the condition of what's there now. We take measurements and learn how traffic moves through the site.

    • Walk-through with you
    • Every line, stencil and zone noted
    • Existing markings and their condition recorded
    • Measurements taken
    • Traffic routes noted
  2. 2. Safety planning

    Our safety plan combines your site's rules, WorkSafeBC requirements and our own safety program. Safety data sheets for every product are kept on site, and any worker can stop the job if something is unsafe.

    • Your site rules, WorkSafeBC and our safety program combined
    • Protective gear set for the job: hi-vis, hard hats, respirators, safety glasses, steel-toe boots, hearing protection
    • Safety data sheets on site for every product
    • Any worker can stop the job if something is unsafe
  3. 3. Layout plan and quote

    We put everything into a written scope of work: every line, stencil and zone to be painted, and the paint we'll use. You review it with your team, and work only goes ahead once you've approved exactly what you want.

    • Every line, stencil and zone listed
    • Paint specified
    • Reviewed and approved before work starts
  4. 4. Scheduling around your traffic

    We set the timing with you: nights, weekends, or one section at a time so traffic keeps moving around us.

    • Planned with your team
    • Nights and weekends
    • One section at a time
  5. 5. Preparing at our warehouse

    The job starts at our own warehouse. We order the line paint specified for your job and load the vehicles with everything the work needs. Anything we don't keep on hand is rented in advance, and the crew goes over the plan before leaving so everyone knows their part.

    • The line paint specified for your job ordered
    • Line painting equipment and stencils
    • Measuring tools
    • Brooms, blowers and cleaners
    • Caution tape, signs and cones
    • Anything we don't own rented in advance
    • Crew reviews the plan before leaving
  6. 6. Sign-in and daily briefing

    We arrive on schedule, sign in and hold the day's safety briefing, joining your site's own briefing where there is one. The crew then walks the day's work area so everyone knows the plan.

    • Arrive on schedule and sign in
    • Daily safety briefing, with your site where there is one
    • Crew walks the day's work area
  7. 7. Work zones

    Each section being painted is closed off with caution tape, signs and cones so people and vehicles stay clear of wet paint.

    • Sections closed with caution tape, signs and cones
    • Traffic kept clear of wet paint
  8. 8. Surface prep

    Dirt and debris are cleared, and the surface is cleaned so the paint grips.

    • Dirt and debris cleared
    • Surface cleaned
  9. 9. Layout

    Lines, stencils and zones are measured and marked out before any paint goes down, so lines run straight and widths stay consistent.

    • Measured and marked out first
    • Straight lines, consistent widths
  10. 10. Inspection before coating

    Before any finish goes on, we check that the surface is clean and every line is marked out. We also check that temperature, humidity and surface conditions are within the limits on the manufacturer's data sheet.

    • The surface is clean and every line is marked out
    • Temperature, humidity and surface conditions within the data sheet limits
  11. 11. Painting

    The lines, stencils and zones are painted section by section, applied to the manufacturer's data sheet.

    • Painted section by section
    • To the manufacturer's data sheet
  12. 12. Final inspection

    The finished work is inspected by our team and you. Anything that isn't right is fixed before sign-off.

    • Inspected by our team and you
    • Touch-ups done before sign-off
  13. 13. Cleanup and handover

    We clear away all equipment and protection and leave the site cleaner than we found it. We tell you when each section can take traffic again.

    • Equipment and protection removed
    • Site left cleaner than we found it
    • You're told when traffic can return

Standards: Lines only last on a clean, sound surface. We prepare asphalt and concrete as the marking paint's data sheet requires before any layout or painting.

Safety on these jobs: We keep safety data sheets on site for every marking product, and any worker can stop the job if something is unsafe. Chemical safety, Stop work authority

Where we do this work: Lots, floors and pools from Horseshoe Bay to Chilliwack, including Richmond, Delta, Surrey, Coquitlam, Langley and Abbotsford.

Line Painting services Parking Lot Line PaintingWarehouse Safety Lines

Related Safety yellow and bollardsFloor coatings

Download the line painting info pack (PDF, 2.3 MB)

Common questions

Don't see your question?

Call 604-861-6644 Talk to a painter

Who does line painting in Vancouver?

A. Craig & Son Painting paints lines across Metro Vancouver and the Fraser Valley, including Vancouver, Burnaby, Surrey, Richmond, Delta and Langley. We're a fifth-generation family company from Surrey, working since 1934.

Is line painting the same as line striping?

Yes. Line painting, line striping and restriping all mean the same thing: painting the markings on your lot or floor.

How much does line painting cost?

Every job is priced after a free site visit, because no two sites are the same. The main things that set the price are how many lines, stencils and zones you need, whether existing markings are being refreshed or a new layout is going down, the surface prep, and whether the work happens overnight or on weekends. You get a written quote before any work starts, and the price only changes if the scope changes or work is added or removed.

How do I get a price for line painting?

Call 604-861-6644 or send a request with the address and what needs marking. We'll come out, look at it and give you a price.

Can you paint the lines when the lot is empty?

Yes. We're available 24/7, so lots can be painted overnight or on weekends when they're quiet.

How do you keep drivers and staff safe while lines are painted?

We follow WorkSafeBC procedures, and the area being painted stays closed to traffic until the paint is dry.

Four-storey building with restained wood columns and beams at the entrance

Looking for a free quote?

Tell us about your building and the work you need. We’ll get back to you to set up a site visit.

Phones answered 7am–7pm, every day. Quote requests are acknowledged the same day.

  • Bonded & insured
  • Member in good standing of DC38
  • Red Seal painters on our crews
  • Lead jobs done by lead-trained crews

Tell us about your project.

By sending a request, you confirm you have read the privacy policy.