Free quote

Tell us about your project.

Tell us about your building and the work you need. We’ll get back to you to set up a site visit. Prefer to talk? Call 604-861-6644.

Text us

By sending a request, you confirm you have read the privacy policy.

Food and pharma walls

Hygienic wall coatings for food and pharma plants.

In a food or drug plant, the walls get washed down, they get inspected, and they can't be peeling.

We've coated walls in many working food and pharmaceutical plants with hygienic epoxy wall systems, and we plan the work around your production.

Book a site visit →

Plant work we do

  • Hygienic epoxy wall systems

    Washable epoxy coatings for plant walls and processing rooms.

  • Working food plants

    Done in food processing plants that keep running, planned around production.

  • Pharmaceutical plants

    Wall coatings in pharmaceutical plants, following each plant's rules for contractors.

  • Our plant reference list

    We've worked in many food and pharmaceutical facilities. Ask us for our reference list.

    Ask for our plant reference list

Who this is for

Plant, facility and maintenance managers at food and pharmaceutical plants, and the engineers and general contractors working with them. Most plants can't stop for us, so we work in planned shutdowns, at night, on weekends, or one room at a time.

Our plant work

Wall coating under way in a food processing plant

How a plant job runs

  1. Walk the plant

    We look at each room and learn how your production runs.

  2. Fit it in

    Work goes into shutdowns, nights, weekends or one room at a time.

  3. Prep the walls

    Walls are cleaned and prepped to the system's data sheet.

  4. Coat and test

    The epoxy goes on, then thickness and adhesion are checked.

See the full process, step by step

For plant and maintenance managers planning wall coatings, here is every step we follow, from the first walk-through to handing each room back.

  1. 1. Walking the plant

    We walk the rooms with your plant or maintenance manager, look at the condition of every wall, and learn how production runs, when it stops, and the rules contractors follow in your plant.

    • Walk-through with your manager
    • Wall condition in each room
    • Production schedule
    • Your rules for contractors
  2. 2. Safety and plant rules

    Your plant's rules for contractors come first, with WorkSafeBC requirements and our own safety program built around them. Safety data sheets for every product are on site, and our respirator program covers the crew.

    • Your plant rules first
    • WorkSafeBC and our safety program
    • Safety data sheets on site
    • Respirator program
  3. 3. Room-by-room scope

    Room by room, the scope lists the walls, how they'll be prepped, and the epoxy system they'll get. You approve it before anything starts.

    • Walls listed room by room
    • Prep for each
    • Epoxy system named
    • Your approval first
  4. 4. Fitting around production

    Most plants can't stop for us, so the work goes into planned shutdowns, nights and weekends, or one room at a time while the rest of the plant runs.

    • Planned shutdowns
    • Nights and weekends
    • One room at a time
  5. 5. Closing off the room

    Each room we're working in is closed off, and equipment that stays in the room is covered.

    • Room closed off
    • Equipment covered
  6. 6. Wall prep

    Walls are cleaned and prepped the way the epoxy system's data sheet, or your spec, asks for, so the coating grips.

    • Walls cleaned
    • Prepped to the data sheet or your spec
  7. 7. Checking the room

    Before epoxy goes on, the walls have to be dry and the room's temperature, humidity and dew point have to be inside the data sheet's limits. We check them first.

    • Walls dry
    • Temperature and humidity checked
    • Surface at least 3°C above the dew point
  8. 8. Applying the epoxy

    The hygienic epoxy system goes on coat by coat, by brush and roll, airless spray or HVLP, with the recoat times on the data sheet and a wet film gauge used as we go.

    • Coat by coat
    • Brush and roll, airless or HVLP
    • Recoat times from the data sheet
    • Wet film checked
  9. 9. Checking the finish

    Dry film thickness is checked with a DFT gauge and adhesion is tested. If there's a third-party inspector on the job, they check it too.

    • DFT readings
    • Adhesion tests
    • Third-party inspector where the job has one
  10. 10. Room back to production

    Coverings come down, the room is cleaned up, and it's handed back once the coating has cured, with our written guarantee.

    • Coverings off and room cleaned
    • Handed back once cured
    • Written guarantee

Standards: Plant walls are prepared and coated to the epoxy system's data sheet and MPI standards, inside the plant's own rules for contractors.

Safety on these jobs: Your plant's rules for contractors come first, and safety data sheets for every coating are kept on site. Chemical safety, Respiratory protection

Where we do this work: Food and pharmaceutical plants across Metro Vancouver and the Fraser Valley.

More industrial coatings services Industrial Coatings Dryfall CeilingsSafety Yellow and BollardsRust Removal and SteelPipe Colour CodingTank and Equipment PaintingChemical-resistant CoatingsProtective CoatingsTank Linings

Related Floor coatings

Common questions

Don't see your question?

Call 604-861-6644 Talk to a painter

Have you worked in plants like ours?

Yes. We've worked in many food and pharmaceutical facilities, and we can send you our plant reference list.

Can you work without stopping production?

Yes. We work in planned shutdowns, at night, on weekends, or one room at a time while the rest of the plant keeps running.

What goes on the walls?

A hygienic epoxy wall system, applied to the manufacturer's data sheet, with film thickness and adhesion checked when it's done.

How much do plant wall coatings cost?

Every plant is priced after a free site visit. The price depends on how much wall there is, its condition and the prep it needs, the epoxy system, and when we can work around production. You get a written quote before any work starts, and the price only changes if the scope changes or work is added or removed.

Four-storey building with restained wood columns and beams at the entrance

Looking for a free quote?

Tell us about your building and the work you need. We’ll get back to you to set up a site visit.

Phones answered 7am–7pm, every day. Quote requests are acknowledged the same day.

  • Bonded & insured
  • Member in good standing of DC38
  • Red Seal painters on our crews
  • Lead jobs done by lead-trained crews

Tell us about your project.

By sending a request, you confirm you have read the privacy policy.