Warehouse painting

Warehouse and industrial painting across the Lower Mainland.

Seven warehouse and storefront buildings, repainted while every business stayed open.

We paint warehouses and light industrial buildings, inside and out, while tenants, trucks and forklifts keep moving.

Inside, that means dryfall on ceilings and steel, safety yellow and floor lines. Outside, it's tilt-up walls, caulking, doors and loading bays. We do the prep properly first, so the coating lasts.

Request a quote →

Warehouse painting in RichmondDeltaSurreyLangley

Warehouse work we do

  • Dryfall ceilings

    Dryfall is a spray coating that dries to dust before it reaches the floor. We use it on open-web joists, steel deck and ductwork, so racking and stock below stay clean.

    Dryfall ceilings

  • Tilt-up panel caulking

    Caulking pulling away from the concrete? We cut out failed sealant and recaulk panel joints and window perimeters before the exterior repaint, helping keep rain out where the gaps have opened up.

    Tilt-up concrete panels move, and the caulked joints between them crack and let water in.

  • Safety yellow and bollards

    Bollards, guardrails, racking ends, stair nosings and handrails coated in high-visibility safety yellow, so drivers and staff see them.

    Safety yellow and bollards

  • Loading docks and overhead doors

    Dock doors need paint but the trucks keep coming? We repaint overhead doors, frames and dock walls one bay at a time around your shipping schedule.

  • Floor line marking

    Forklift aisles, pedestrian walkways and hatched no-go zones, laid out to meet WorkSafeBC requirements.

    Warehouse safety lines

  • Floor coatings

    Epoxy and non-slip coatings for shop floors, plant floors and anywhere the concrete takes a beating.

    Epoxy floor coating

  • 24/7 scheduling

    After-hours, overnight and weekend work so operations keep running.

Dock doors, walls and safety yellow can be kept in good condition under a maintenance contract. Maintenance contracts →

Where we do this work: We paint warehouses and business parks across the Lower Mainland, from Port Kells in Surrey and Annacis Island in Delta to Richmond, Langley, Coquitlam and Port Coquitlam, and out to Abbotsford in the Fraser Valley.

Capacity and equipment

  • More than 100 warehouses painted in the past 20 years, over 50 of them in the last 5 years
  • In warehouses alone, full exterior repaints on record since 2003 total more than 3 million sq. ft. of buildings, over ten miles of exterior and more than a million sq. ft. of wall
  • Seven occupied warehouse and storefront buildings in Richmond repainted in one project while every business stayed open: about 236,000 sq. ft. of buildings, more than 140,000 sq. ft. of exterior wall and over a mile of perimeter
  • Three occupied distribution warehouses in one Richmond industrial park, totalling more than 400,000 sq. ft., repainted to a written specification under an independent coating inspector: more than 130,000 sq. ft. of exterior wall, plus man doors, overhead doors, bollards and dock frames, with roof flashings and canopies washed
  • 20 full-time and 30 part-time painters, with crews of 20 or more on a single site when the job calls for it
  • All painting, coating and prep by our own crews; only rope access and carpentry go to trusted long-term partners
  • Company-owned spray equipment, with lifts and scaffolding rented to suit each job
  • More than 15 service vehicles, two trailers and two company-owned, fully stocked supply warehouses
  • WorkSafeBC certificate up to date, bonded and insured, with certificates available on request
  • References provided with your quote

Warehouse counts are individual buildings.

Download our company profile (PDF)

Standards: Tilt-up concrete, galvanized deck and structural steel each get the surface preparation set out in Master Painters Institute (MPI) standards and in the coating's data sheet.

Our warehouse work

Warehouse exterior, Surrey, before: beige and tan panelled walls with grey-blue glazing at the corner and overhead doors along the side
Before
Warehouse exterior, Surrey, after: the same corner with yellow and grey-brown walls and a blue band
After
Warehouse exterior, Surrey, before: the long front wall in beige and tan panels with windows and overhead doors
Before
Warehouse exterior, Surrey, after: the front wall in grey-brown with a blue band under the windows
After
Warehouse exterior, Surrey, before: a wider view of the long wall in beige and tan with windows and overhead doors
Before
Warehouse exterior, Surrey, after: a wider view of the wall in grey-brown with a blue band and yellow door trim
After
Industrial plant exterior repainted, before
Before
Industrial plant exterior repainted, after
After
Business park warehouse exterior repainted, loading doors along the front
Warehouse interior walls repainted
Warehouse complex exterior repainted, with a blue accent band
Warehouse complex end wall and office windows repainted
Warehouse complex side wall repainted behind the landscaping
After: two-storey grey and white warehouse office corner with pink azaleas
After: repainted cream and grey warehouse wall with numbered dock doors, a forklift and blue sky
Before painting: rust-stained red canopy and window frames on a commercial building
After painting: repainted red steel canopy and window frames on a cream wall

Before and after

Business Centre Restoration

This commercial building required extensive restoration due to severe cracking and alkali bleeding. To ensure a long-lasting finish, we used a specialized three-coat system of primer, high-build coat and satin latex finish.

Read the full project →

More warehouse projects

After painting: warehouse interior transformed with white ceilings and bright yellow column guards Light Industrial · 11 photos

100,000 sq. ft. Warehouse Interior

This 100,000 sq. ft. warehouse underwent a complete interior transformation, turning a dark, dirty, and difficult-to-lease space into a bright, modern facility. Our team first used a phosphoric acid treatment to properly etch the galvanized steel ceiling, ensuring maximum coating adhesion and long-term durability. We then applied a clean white finish to the ceiling, walls, and structural columns while highlighting the lower steel with safety yellow for improved visibility and workplace safety.

Before and after

Before: grimy industrial walls and a worn overhead door
Industrial exterior, after: Grimy walls and a worn overhead door washed, prepped and repainted
Industrial exterior. Grimy walls and a worn overhead door washed, prepped and repainted.
Warehouse ceiling and walls, before
Warehouse ceiling and walls, after: Ceiling deck, joists, walls and columns painted
Warehouse ceiling and walls. Ceiling deck, joists, walls and columns painted.
Before: faded forklift zone, walkway lines and stencils
Forklift lane, after: Faded forklift zone, walkway lines and stencils repainted
Forklift lane. Faded forklift zone, walkway lines and stencils repainted.

How a warehouse repaint runs

  1. Walk-through and scope

    We walk the building with you and put every surface, repair and coating into a written scope for your approval.

  2. Scheduled around you

    Docks and doors are done in sections, after hours or on weekends if needed, so trucks keep moving.

  3. Wash, repair and prime

    Washing, sealant, crack repair, steel prep and rust priming come before any finish.

  4. Coat, inspect, hand back

    The quoted coating system goes on, then we walk the finished building with you.

See the full process, step by step

For property and facility managers planning a repaint, here is every step we follow, from the first walk-around to handing the building back.

  1. 1. Site tour

    We walk the whole building with your property or facility manager. We look at every wall, tilt-up panel and joint, the steel, doors, canopies and signage, and note the condition of each. We take measurements, check lift access around the building, and learn how the site runs: shipping hours, dock traffic, tenants and the safety practices already in place.

    • Walk-around with your property or facility manager
    • Every surface and its condition recorded
    • Measurements and lift access checked
    • Shipping hours, docks and tenants noted
    • Your site's safety practices reviewed
  2. 2. Safety planning

    Our safety plan combines your site's rules, WorkSafeBC requirements and our own safety program. High work is done from aerial lift platforms, and everyone who operates one is safety trained. A harness is worn on boom lifts, and every lift is inspected before use. For hard-to-reach areas, we plan access ahead of time and use the best method for the spot, whether that's a different lift, scaffolding or our trusted long-term rope access partners. Safety data sheets for every product are kept on site, and any worker can stop the job if something is unsafe.

    • Your site rules, WorkSafeBC and our safety program combined
    • Aerial lift platforms run only by safety-trained operators
    • Harnesses on boom lifts, lifts inspected before use
    • Hard-to-reach areas planned ahead: the right lift, scaffolding or rope access
    • Protective gear set for the job: hi-vis, hard hats, respirators, safety glasses, steel-toe boots, hearing protection
    • Safety data sheets on site for every product
    • Any worker can stop the job if something is unsafe
  3. 3. Scope and quote

    We put everything into a written scope of work: which surfaces are included, how each will be prepared, and the coating system for each one. You review it with your team, and work only goes ahead once you've approved exactly what you want.

    • Written scope of every surface included
    • Prep method for each surface
    • Coating system specified surface by surface
    • Reviewed and approved by your team before work starts
  4. 4. Scheduling around your operation

    We schedule with you so the building keeps running. Dock walls and overhead doors are done in sections so trucks keep moving, tenants know which elevation is next, and work can run after hours or on weekends where needed.

    • Planned around shipping and receiving
    • Docks and overhead doors done in sections
    • Tenants told which elevation is next
    • After hours and weekends where needed
  5. 5. Preparing at our warehouse

    The job starts at our own warehouse. We order the coatings specified for your building and load the vehicles with everything needed. Lifts and anything we don't keep on hand are rented in advance, and the crew goes over the plan before leaving so everyone knows their part.

    • Coatings ordered to the quoted specification
    • Pressure washers, grinders, scrapers and sanders
    • Sprayers, brushes and rollers
    • Sealants, patching compounds and primers
    • Caution tape, signs and cones
    • Aerial lifts, scaffolding and other equipment rented in advance
    • Crew reviews the plan before leaving
  6. 6. Sign-in and daily briefing

    We arrive on schedule, sign in, and join your site's safety briefing. The crew walks the day's work area so everyone knows the zones, the traffic routes and where the lifts will be.

    • Arrive on schedule and sign in
    • Daily safety briefing with your site
    • Crew walks the day's zones, traffic routes and lift positions
  7. 7. Work zones and protection

    Each work area is closed off with caution tape, signs and cones, so people and vehicles stay clear of lifts and spraying. Anything not being painted is protected from overspray before coating starts.

    • Work areas closed with caution tape, signs and cones
    • People and vehicles kept clear of lifts and spraying
    • Surfaces not being painted protected from overspray
  8. 8. Exterior wash

    The building is washed to the scope of work. Dirt, chalking and mildew come off, efflorescence is removed, and heavy rust staining is cleaned off the walls.

    • Pressure washed to the scope of work
    • Dirt, chalking and mildew removed
    • Efflorescence removed
    • Heavy rust staining cleaned off
  9. 9. Surface cleanup

    Every surface is cleaned of anything that would stop the coating bonding: gum, grime, oil, old tape and tape residue. Old signage is taken down, unwanted steel sticking out of the walls is ground off, and old wires are removed safely. Those spots are then primed.

    • Gum, grime, oils, tape and tape residue removed
    • Old signage taken down
    • Protruding steel ground off
    • Old wires removed safely
    • Bare spots primed
  10. 10. Repairs and sealant

    Joints and gaps are patched and caulked, and failed building sealant is replaced. Major imperfections are ground out, and hairline cracking is sealed with the right compounds, so the finished walls shed water and look even.

    • Patching and caulking
    • Failed building sealant replaced
    • Major imperfections ground out
    • Hairline cracks sealed with the right compounds
  11. 11. Steel prep

    Railings, bollards, man doors, overhead doors, canopies, dock levellers and other steel are scraped, sanded, repaired and rust-primed to the scope of work, so the finish coats go onto sound metal.

    • Railings and bollards
    • Man doors and overhead doors
    • Canopies and dock levellers
    • Scraped, sanded, repaired and rust-primed
  12. 12. Inspection before coating

    Before any finish goes on, we check that every surface has been washed, cleaned, repaired and primed to the scope, and that weather and surface conditions are within the limits on the manufacturer's data sheet.

    • Every surface washed, cleaned, repaired and primed
    • Weather and surface conditions within data sheet limits
  13. 13. Applying the coating system

    The coating system goes on exactly as quoted. That may be a primer coat, an intermediate coat and top coats, or a high-build elastomeric, applied to the manufacturer's data sheet and MPI standards. The order varies from building to building: overhead doors are usually sprayed, and man doors and railings are painted to suit.

    • Coating system applied as quoted
    • Primer, intermediate and top coats, or high-build elastomerics
    • To the manufacturer's data sheet and MPI standards
    • Overhead doors sprayed; doors and railings painted to suit
    • Order of work planned for each building
  14. 14. Dock and door numbers

    Once the coatings are on, dock numbers, door numbers and other markings are painted back on, so drivers and staff can find their way around the building.

    • Dock numbers
    • Door numbers
    • Other markings your site needs
  15. 15. Final inspection

    The finished building is inspected by our team and your property or facility manager. Anything that isn't right is fixed before sign-off.

    • Inspected by our team and your manager
    • Touch-ups done before sign-off
  16. 16. Cleanup and handover

    We clear away all equipment and protection and leave the site cleaner than we found it, with a building that looks fresh and is protected for years to come.

    • Equipment and protection removed
    • Site left cleaner than we found it
    • Building handed back

Safety on these jobs: Only trained operators run our lifts, a harness is worn on boom lifts, and each lift is inspected before use. Lifts, Fall protection

Download the warehouse painting info pack (PDF, 8.3 MB)

Common questions

Don't see your question?

Call 604-861-6644 Talk to a painter

Can tenants keep working while you paint?

Yes. We plan each section around the tenants' hours and doors. On one three-building complex every business stayed open for the whole repaint, and another warehouse was done in phases around other trades.

What does a warehouse repaint include?

The prep comes first: cleaning, crack repairs and spot-priming any rust. Then we coat the walls, doors, windows, handrails, bollards and flashings. Inside, we also do ceilings, structural steel and loading bays.

Can you fix cracked walls and alkali stains?

Yes. Alkali bleeding is the white salt stain that pushes through paint on concrete. On one business centre we used an alkali-resistant bonding primer, then a high-build coat to bridge the hairline cracks, then the finish coat.

How much does it cost to paint a warehouse?

Every warehouse is priced after a free site visit, because no two buildings are the same. The main things that set the price are the wall area and height and the lifts it needs; how much steel there is, such as man doors, overhead doors, railings, bollards and canopies; how much caulking, crack repair and rust treatment is needed; the coating system; and whether we work around your shifts, after hours or in phases.

How does a warehouse quote work?

A painter visits the site at no charge before we price it. You get a written quote, and the price only changes if the scope changes or work is added or removed. An itemized breakdown is available on request, and multi-building or multi-year work can be priced in phases.

Is warehouse painting guaranteed?

Two-coat work comes with a 2-year guarantee against coating failure, and single-coat work with 1 year. Both are on top of the paint manufacturer's own product warranty. The exact warranty depends on the job. For the full terms and conditions, email acraigandson@yahoo.ca.

How do your crews stay safe in a working warehouse?

We follow WorkSafeBC procedures, and crews stay harnessed in boom lifts. Work areas are planned with your team so trucks and forklifts can keep moving.

Four-storey building with restained wood columns and beams at the entrance

Looking for a free quote?

Tell us about your building and the work you need. We’ll get back to you to set up a site visit.

Phones answered 7am–7pm, every day. Quote requests are acknowledged the same day.

  • Bonded & insured
  • Member in good standing of DC38
  • Red Seal painters on our crews
  • Lead jobs done by lead-trained crews