Case study · Strata
- Homes in one community
- 84
- Colour schemes
- 7
- Years, start to finish
- 2
- Inspected the work
- MPDA
Our largest strata repaint: a high-end community of 84 individual homes, fully repainted over a two-year period. The project featured seven unique colour schemes and was completed under inspection by the MPDA to ensure the highest quality standards.
Through careful planning and consistent communication with residents, the project was completed on schedule, within budget, and to the satisfaction of both the client and inspectors.
Safety on jobs like this: Ladders are inspected before each use, and our scaffolds are built to carry at least four times their intended load. Scaffolding, Ladders
More in Surrey: Strata painting in Surrey
How a strata repaint runs, step by step
Planning similar work?
Price my project →The job at a glance
- Property
- A high-end strata community of 84 individual homes
- Scope
- A full repaint of the whole community
- Surfaces
- Siding, shingles, porch columns, dormers, trim and railings
- Phases
- Two phases: 43 homes in 2018 and 41 in 2019
- Also painted
- Stucco walls, door frames, garage doors, entry and French doors, and steel light standards
- Prep
- Pressure wash, loose and peeling paint removed, failed caulking replaced at siding joints, open mitres and trim gaps caulked, nail heads spot-primed, loose siding nailed back
- Coatings
- Primer plus two coats on every surface. Siding, panels and stucco in alkali-resistant primer and exterior latex satin, trim in alkyd stain blocker and exterior latex satin, doors and frames in water-based or alkyd finishes
- Resident notices
- Written notices before washing and painting: move furniture and barbecues away from the walls, keep windows closed during washing, keep driveways clear so lifts can get in, and sign-up sheets for front-door painting
- Colours
- Seven colour schemes
- Access
- Ladders and boom lifts, with fall protection
- Residents
- Stayed in their homes throughout, and kept informed through consistent communication
- Time and budget
- Two years, completed on schedule and within budget
- Quality
- Inspected by the MPDA, to the satisfaction of both the client and the inspectors
Case study: how a job like this runs
Large complex or small, the job runs the same way. Here is how that works on a strata repaint.
-
Site walkthrough with council
We walk the complex with council or the property manager and look at siding, trim, doors, railings and fences, any rotten wood, and access around each building.
-
Scope and planning
The quote sets out the scope by surface and the coating for each one. Wood repairs are priced separately, so council can see what the repairs cost.
-
Scheduling and resident notices
Work moves building by building. Residents get notice before washing and painting, with time to close windows and clear decks and patios.
-
Safety and site protection
A trade-qualified foreman runs the site. Lift and ladder work follows WorkSafeBC requirements, including fall protection. Work areas are barricaded, plants and fixtures are covered, and plywood goes down under lifts on soft ground.
-
Washing, repairs and preparation
Every surface to be painted is washed. Failing paint is scraped and sanded, failed caulking is replaced, and our long-term carpentry partners replace rotten wood.
-
Pre-coating inspection
The foreman checks that washed surfaces are dry and that repairs and caulking are finished before any coating goes on.
-
Priming
Bare wood is spot primed with a wood primer. Doors get a full coat of bonding primer.
-
Finish coats
Siding and trim get two coats of premium satin. Rails and fences get two coats of stain, and doors get two coats of semi-gloss.
-
Cleanup and site restoration
Coverings come off, fall-protection anchor holes are patched and painted, and equipment and waste leave the property.
-
Final walkthrough and handover
We walk the buildings with council or the property manager. On jobs that call for it, an MPDA inspector reviews the work as well.
Standards: Painted under MPDA guidelines to MPI standards, with each product applied to the manufacturer's instructions and the site run to WorkSafeBC requirements.
More strata projects
Before & after Strata Trim Repaint
This was a smaller strata maintenance project involving targeted wood repairs and a trim repaint. With a two-person crew, we were able to complete the work efficiently, on schedule, and within the strata’s budget.
Strata Maintenance Program
This was a larger strata maintenance project involving more extensive wood repairs and a full trim repaint across multiple buildings. Due to the increased scope, a larger crew was deployed and the work was completed over a longer schedule while maintaining efficiency and consistency throughout.
Looking for a free quote?
Tell us about your building and the work you need. We’ll get back to you to set up a site visit.
Phones answered 7am–7pm, every day. Quote requests are acknowledged the same day.
- Bonded & insured
- Member in good standing of DC38
- Red Seal painters on our crews
- Lead jobs done by lead-trained crews