Free quote

Tell us about your project.

Tell us about your building and the work you need. We’ll get back to you to set up a site visit. Prefer to talk? Call 604-861-6644.

By sending a request, you confirm you have read the privacy policy.

Aeronautics Facility Interior

Schools & Campuses

After painting: refreshed white walls around a drinking fountain and washroom signs in an aeronautics facility

Over a three-year period, we completed a full refresh of a large aeronautics facility, working across hallways, offices, labs, training rooms, classrooms, recreation areas, cafeteria, and library spaces. In addition to painting, the scope included the supply and installation of custom stainless steel corner guards in high-traffic areas, as well as Acrovyn wall protection in locations subject to regular impact damage. The result was a durable, clean, and well-protected interior throughout the facility.

Planning similar work? Price my project →

Project photos

Before painting: long, curved corridor with dull grey-beige walls in an aeronautics facility
Before
After painting: refreshed white walls around a drinking fountain and washroom signs in an aeronautics facility
After
After painting: freshly painted doorway leading into a facility kitchen
After
After painting: wide aeronautics facility hallway with dark grey feature walls and polished concrete
After
After painting: facility library with teal and blue feature walls above rows of bookshelves
After
After painting: office area with a bright blue feature wall and painted partitions
After
After painting: facility cafeteria with round tables and warm taupe and grey painted walls
After
After painting: cafeteria servery with a bright blue accent wall above the counter
After
After painting: upper-floor corridor with grey and cream painted walls and polished concrete
After

More schools & campuses projects

After painting: two-storey secondary school repainted in soft grey and cream above red block Before & after Schools & Campuses · 6 photos

Secondary School Exterior

This project involved taking over a school repaint contract after the low bidder was unable to meet the requirement for qualified painters. The school board brought us in on a very tight timeline to ensure the work could be completed properly and safely. We prioritized high-traffic student areas and entrances first, completing them before the school year began. The remaining work was then carried out in September with careful scheduling to minimize disruption to students and staff. The project was delivered on time and to specification.
After painting: restored post-secondary building with smooth, even light grey panels Before & after Schools & Campuses · 8 photos

Post-Secondary Restoration

A post-secondary building required significant restoration due to widespread coating failure and the presence of lead-based paint. The work was carried out in an active, year-round teaching environment, requiring careful planning to minimize disruption to staff and students. After safe preparation and remediation of existing coatings, the building was repainted with durable finishes designed for high-traffic, high-impact conditions. The result was a refreshed, resilient exterior capable of withstanding heavy daily use while improving the overall appearance of the facility.