A post-secondary building required significant restoration due to widespread coating failure and the presence of lead-based paint. The work was carried out in an active, year-round teaching environment, requiring careful planning to minimize disruption to staff and students. After safe preparation and remediation of existing coatings, the building was repainted with durable finishes designed for high-traffic, high-impact conditions. The result was a refreshed, resilient exterior capable of withstanding heavy daily use while improving the overall appearance of the facility.