Before & after
Get a quote Text us Automotive Shop Floor
Case study · Light Industrial
This floor had years of embedded oil contamination that regular washing and etching could not fully remove or prepare for a new coating system. To ensure proper adhesion, we had the surface shot blasted to remove contamination and open up the concrete profile. The resulting clean, even surface provided an ideal mechanical bond for the epoxy system, ensuring long-term durability and performance.
Safety on jobs like this: We keep safety data sheets on site for every product we use and handle them under our WHMIS program. Chemical safety, Emergency plan
Planning similar work?
Price my project →Case study: how a job like this runs
The same steps apply on every job we do. In a working shop, they look like this.
-
Shop walkthrough
We check how deep the oil contamination goes, the state of any existing coating, and which bays can be closed and when.
-
Planning the preparation
The preparation method is chosen to suit the floor: cleaning and abrading for sound coatings, shot blasting where oil has soaked into the concrete.
-
Scheduling bay by bay
The shop is done in sections, so work carries on in the other bays. Coating is often done in the evening to give it the night to cure, and you know the plan for each week.
-
Safety and ventilation
The shop's exhaust and ventilation run during coating and curing, and closed bays are kept clear, following WorkSafeBC requirements. Walls and equipment that stay in the work area are protected.
-
Floor preparation
Each section is cleared, degreased and then abraded or shot blasted to open up the concrete. Dust is vacuumed off afterwards.
-
Inspection before coating
Oil left in the concrete will lift a coating, so the foreman checks each section is clean and properly profiled before any epoxy goes down.
-
Priming
Most floor epoxies prime themselves, so the first coat goes straight onto the prepared concrete. Where the product calls for a separate primer, that goes down first.
-
Epoxy finish and floor markings
The number of coats follows the product's guidelines and what you want from the floor. Shop floors are usually kept smooth so oil and fluids wipe clean, and existing safety lines and floor markings are repainted.
-
Cleanup
Masking comes off and the section is cleaned up, ready for the walkthrough.
-
Final walkthrough and handover
We confirm the coating has cured, walk the floor with you, and tell you when vehicles and equipment can go back on.
Standards: Concrete is prepared to SSPC standards, and the coating follows MPI standards and the epoxy manufacturer's data sheet, including cure time before traffic.
More light industrial projects
Before & after
100,000 sq. ft. Warehouse Interior
This 100,000 sq. ft. warehouse underwent a complete interior transformation, turning a dark, dirty, and difficult-to-lease space into a bright, modern facility. Our team first used a phosphoric acid treatment to properly etch the galvanized steel ceiling, ensuring maximum coating adhesion and long-term durability. We then applied a clean white finish to the ceiling, walls, and structural columns while highlighting the lower steel with safety yellow for improved visibility and workplace safety.
Multi-Tenant Business Complex
This large multi-tenant, three-building commercial complex received a complete exterior refresh to restore its appearance and protect the property for years to come. Our scope of work included painting the windows, doors, handrails, bollards, flashings, and exterior walls, creating a clean, cohesive finish across the entire development.
Looking for a free quote?
Tell us about your building and the work you need. We’ll get back to you to set up a site visit.
Phones answered 7am–7pm, every day. Quote requests are acknowledged the same day.
- Bonded & insured
- Member in good standing of DC38
- Red Seal painters on our crews
- Lead jobs done by lead-trained crews