Free quote

Tell us about your project.

Tell us about your building and the work you need. We’ll get back to you to set up a site visit. Prefer to talk? Call 604-861-6644.

Text us

By sending a request, you confirm you have read the privacy policy.

After painting: warehouse interior transformed with white ceilings and bright yellow column guards

100,000 sq. ft. Warehouse Interior

Case study · Light Industrial

This 100,000 sq. ft. warehouse underwent a complete interior transformation, turning a dark, dirty, and difficult-to-lease space into a bright, modern facility. Our team first used a phosphoric acid treatment to properly etch the galvanized steel ceiling, ensuring maximum coating adhesion and long-term durability. We then applied a clean white finish to the ceiling, walls, and structural columns while highlighting the lower steel with safety yellow for improved visibility and workplace safety.

The result was a dramatic improvement in both appearance and functionality. Within just a few weeks of completion, the refreshed space became significantly more attractive to prospective tenants, demonstrating how a professional commercial paint project can add real value to an industrial property.

Safety on jobs like this: Only trained operators run our lifts, a harness is worn on boom lifts, and each lift is inspected before use. Lifts, Fall protection

Planning similar work?

Price my project →

Case study: how a job like this runs

Every site runs the same way, whatever its size. Here is what that looks like inside a warehouse.

  1. Building walkthrough

    We walk the building with you and look at the ceiling deck, steel, walls and floor, the access for lifts and what has to stay in place.

  2. Project planning

    Each surface gets its own coating system, chosen from the manufacturer's data sheets. Lifts and spray equipment are sized to the ceiling height.

  3. Scheduling and communication

    The work is sequenced bay by bay around tenants, leasing dates and any other trades on site, and you get regular updates as it moves.

  4. Safety and site protection

    A qualified foreman runs the site. Work areas are barricaded, lift and spray work follows WorkSafeBC requirements, and racking, fixtures and floors that aren't being painted are covered.

  5. Surface preparation

    Surfaces are cleaned of dust and grease, and galvanized steel is etched so the coating bonds.

  6. Pre-coating inspection

    Before any coating goes on, the foreman checks that every surface is clean, dry and sound.

  7. Priming

    Bare or rusted steel gets a rust-inhibitive primer. Hard, glossy surfaces get a bonding primer.

  8. Finish coats

    Ceilings and walls are sprayed. Columns and lower steel are finished by spray, brush or roller, in safety yellow where you want it.

  9. Cleanup and site restoration

    Coverings and masking come off, lifts and equipment leave the site, and the floor is left clean.

  10. Final walkthrough and handover

    We go over the finished work with you, deal with any touch-ups and hand the space back.

Standards: Prepared and coated under MPDA guidelines to MPI standards, with SSPC surface preparation standards for the steel and the coating manufacturer's instructions for every product.

Project photos

Scissor lift spraying a warehouse ceiling, with a mist of paint in the air
During
Painter on a scissor lift spraying dark steel decking and red warehouse beams
During
Warehouse office area covered in tarps to protect it from overhead spraying
During
Warehouse ceiling with red beams and steel deck, partway through spraying
During
Tarp-covered scissor lift below a warehouse ceiling being sprayed white
During
Warehouse interior with a white ceiling and columns, partway through painting
During
After painting: bright white warehouse ceiling with new lighting and painted columns
After
After painting: clean white warehouse with yellow-banded columns and an open floor
After
After painting: long view through a 100,000 sq. ft. warehouse with white columns and yellow bases
After
After painting: warehouse wall and dock doors painted white, seen along a sealed concrete floor
After
Four-storey building with restained wood columns and beams at the entrance

Looking for a free quote?

Tell us about your building and the work you need. We’ll get back to you to set up a site visit.

Phones answered 7am–7pm, every day. Quote requests are acknowledged the same day.

  • Bonded & insured
  • Member in good standing of DC38
  • Red Seal painters on our crews
  • Lead jobs done by lead-trained crews

Tell us about your project.

By sending a request, you confirm you have read the privacy policy.